Post-construction cleaning, also called a builders clean or after-builders clean, removes fine dust, paint, plaster, silicone and adhesive residue and leaves glazing, joinery, bathrooms and kitchens ready for handover. Holiday Host Spain does it across the Costa del Sol, from Málaga to Estepona, for developers, builders and owners: in phases, coordinated with the site, with a tailored quote. Holiday Host Spain is a Malaga-based company, headquartered on the Costa del Sol, with service across Spain, the islands, Portugal and internationally.
Get a tailored quote for your project. For a national overview, see post-construction cleaning across Spain.
Builders clean, sparkle clean, handover clean: what each one means
A builders clean is the first clean once the trades finish. A sparkle clean is the fine clean before handover. A handover or new-build clean is the final standard the buyer sees on key day. We do all three, in phases, so nothing is cleaned twice and nothing is missed.
What our post-construction cleaning includes
- Fine dust on ceilings, walls, floors, skirting and inside wardrobes
- Glazing, frames, tracks and shutters
- Bathrooms and kitchens: sanitaryware, taps, worktops, inside units
- Paint, plaster, silicone, tile adhesive, protective film and labels
- Terraces, balconies, sun decks and pool area
What is not included
We do not remove rubble or bags: we start once the site has removed them. Our work is the fine clean for handover.
For developers and builders: phased, handover-ready, one contact
A development is not handed over when the build ends, but when the buyer opens the door and finds the home ready. We work inside the site schedule, coordinated with the site manager, and hand over every home to the same standard. Afterwards we stay alongside the developer and the property manager: regular cleaning, holiday rentals, hosts and building maintenance.
- Coordination with the site manager
- Photo report per home
- Phases by block, floor or home, following the handover schedule
See also our building maintenance and holiday rental cleaning services.
Luxury villas after the build
Marble and natural stone, microcement, timber, large glazing, pool and garden: each material with its own product and method.
Post-construction cleaning in Marbella
Villas on the Golden Mile, Sierra Blanca and Nueva Andalucía and new developments in Los Monteros: marble, stone and large glazing, with a second pass before handover.
Spanish page for this town: limpieza de fin de obra en Marbella.
Post-construction cleaning in Estepona
New developments on the New Golden Mile and in the town centre, and detached villas in Valle Romano, cleaned unit by unit for key handover.
Spanish page for this town: limpieza de fin de obra en Estepona.
Post-construction cleaning in Málaga
New builds in Teatinos and the western seafront, renovated flats in the historic centre with restricted access, and high-end homes in Málaga East.
Spanish page for this town: limpieza de fin de obra en Málaga.
Mijas, Fuengirola, Benalmádena and Torremolinos
One line each: La Cala and golf resorts (Mijas); new buildings near the seafront (Fuengirola); Torrequebrada and renovations between seasons (Benalmádena); Montemar and La Carihuela (Torremolinos).
Spanish pages: Mijas · Fuengirola · Benalmádena · Torremolinos.
What to send for a quote
Email [email protected] or call +34 604 397 185 with these details and we will send a tailored quote:
- Location
- Size in m² or number of homes
- New build or renovation
- Glazing and outdoor areas
- Handover date
- Photos (optional)
FAQ
What does post-construction cleaning include?
Removing fine dust from ceilings, walls, floors and wardrobes; cleaning glazing, joinery, bathrooms and kitchens; and removing paint, plaster, silicone, adhesive, protective film and labels so the home is ready for handover.
Is a builders clean the same as post-construction cleaning?
Yes. Builders clean, after-builders clean and post-construction cleaning describe the same job. On new builds it is often called handover or new-build cleaning.
Do you remove rubble?
No. We start once the site has removed rubble and bags; our work is the fine clean for handover.
Do you work with developers on large developments?
Yes. We clean by block, floor or phase following the handover schedule, with one contact throughout.
How much does post-construction cleaning cost on the Costa del Sol?
It depends on size or number of homes, type of build, bathrooms, glazing and outdoor areas, and the handover date. We send a tailored quote from photos or a site visit.
Which areas do you cover?
The whole Costa del Sol, including Málaga, Torremolinos, Benalmádena, Fuengirola, Mijas, Marbella and Estepona.
How do I get a quote?
Email [email protected] or call +34 604 397 185 with the location, size, type of build and handover date.
More: post-construction cleaning across Spain · cleaning services on the Costa del Sol · cleaning levels · Versión en español.
Send the location, size, type of build and handover date for a tailored quote.